Information about the repair work on GARDABANI (330kV)
In coordination with the National Dispatcher Center, Electricity Transmission Line GARDABANI (330kV) was under repair on September 3 and 4, 2020.
Under the agreed timetable, the transmission line had to be repaired in 6 days (from September 1 to 6). Due to some reasons, GARDABANI has been under repair several times, in total for 19 days, in 2020. During the mentioned period of time the personnel of the UES JST SAKRUSENERGO has managed to perform certain capacity of repair work defined under the plan. Considering this, two days turned out to be sufficient for carrying out the rest of the repair work.
The following operations were performed on the electricity transmission line GARDABANI (330kV) in 2020:
- Removal of bird nests from the crossbars of the towers: NN 23; 24; 26; 27; 30; 32; 33; 34; 35; 36; 43; 56; 57; 59; 60;
- The replace of the isolators bent in the loop on the towers N40 and N45, in total 8 isolators;
- Ascending inspection of the territory, 17 towers;
- Cutting down the plants grown in the span NN41-42, etc.;
The repair work was conducted by the employees of the Operation-Repair and Transport offices.