In November 2011, S.S. A brief overview of the works performed on the power transmission lines of “Sakrusenergo”.

In November 2011, S.S. A brief overview of the works performed on the power transmission lines of “Sakrusenergo”.

E.G.Kh. “Caucasus”
– Deforestation works were carried out on the territory of Russia, in particular, the following sections of the forest were deforested: No. 108-108A, 125-126, 127-128, 133-134, 600-639 and 711-753.
Maintenance works were also carried out: night patrols at towers #44, 74, 217, 233 and 360, checking the condition of foundations in the section between towers #207-403.

E.G.Kh. “Imereti”
– At the beginning of November, the large-scale logging works of the entire length of the EKH, which started in September, were completed.

E.G.Kh. “threat”
– Cable installation works continue in section No. 1-36/1. During the mentioned period, the foundations were laid, a new, У2 type No. 24a mast was built and installed, and grounding was arranged.
– Cable installation works were carried out in section #12-#24a.
– In December, it is planned to install the cable in anchorage No. 1-12, installation of de-energization on section No. 1-36 and thermal welding of loops on corner masts, thus completing the repair works of No. 1-36/1.

E.G.Kh. “Adjara”
Large-scale logging works are underway along the entire length of the railway, in particular, the sections between towers #15-17 and #19-46 of the railway were felled in November, the estimated deadline for the completion of the logging works is the middle of December.

Other news

ლოგო-1-1200x857-2-qw31cbgkq2fy8i4erku8k3du5unuj5rgxx5ldl8rds

სს გეს „საქრუსენერგო“-ს აქციონერთა საერთო კრების შესახებ

ლოგო-1-1200x857-2-qw31cbgkq2fy8i4erku8k3du5unuj5rgxx5ldl8rds

სს გეს „საქრუსენერგო“-ს აქციონერთა საერთო კრების შესახებ

ლოგო-1-1200x857-2-qw31cbgkq2fy8i4erku8k3du5unuj5rgxx5ldl8rds

General Meeting of shareholders of JSC UES SAKRUSENERGO

This site is under construction