Brief Survey Of the works carried out on the power transmission

Power transmission line “Kavkasioni”
There were no repair works conducted in the Georgian section in March.
In the Russian section there were conducted chopping works, particularly a section (5 spans-1,47 km) between towers of current line #589-594 was chopped. A shortening point of ice melting has been observed; On #210, 212, 215, 219, 221, 243, 248, 251, 252, 253, 254, 255, 259, 260, 262, 263, 296, 298, 300, 301, 302, 304, 305, 308, 309, 319, 320, 322, 323, 325 (30 towers) the intermediate towers fixing cables of the tower have been adjusted; On #251, 252, 253, 262, 288, 315, 305, 306, 308, 322 (10 towers) towers the ground connections of fixing cables have been repaired; The towers #217, 234, 388, 496а, 297, 711, 712, 713 (8 towers) located in the landslide danger areas have been observed.
Power transmission line “Imereti”
On March 16 during the 3 hour repair work of the current line the C phase loop damaged wiring of tower #144 and the A phase loop wirings of tower #340 have been repaired. The round-inspection of sections between towers #71-117, 130-175, 220-285 of current line has been conducted with the aim of defectiveness.
Power transmission line “Kartli-2”
The unplanned round-inspection of the whole length of current line (#1-475) has been conducted.
Power transmission line “Kartli-1”
From March 20 to April 3 during 15 day repairs the following types of repair works were conducted:
The broken insulators on towers ##40, 42, 43, 51, 52, 54, 55, 56, 57, 58, 61, 62, 68, 86, 91, 100, 101, 102, 114, 116, 121, 122, 130, 131, 136, 137, 140, 141, 149, 152, 153, 156, 163, 164, 166, 186, 187, 188, 193, 239, 240 were changed – totally on 41 towers 243 broken insulators have been changed. On towers #115 and #116 B phase garlands have been changed, totally 48 insulators;
The china insulators were changed by vitreous insulators on ##179, 180, 181, 182, 186, 187, 188, 193, 202, 207, 208, 226 – totally on 12 angular towers 4968 insulators have been changed.
On tower #41 75 dirty insulators have been changed;
On tower #170 on all three phases the whole garlands have been changed, totally 75 insulators have been changed;
On the lightning protector cables vibration dampers have been mounted on towers ##16, 17, 19, 20, 40, 41, 42, 43, 52, 53, 55, 56, 57, 58, 62, 65, 86, 91, 100, 102, 114, 115, 116, 121, 127, 128, 130, 131, 136, 137, 141, 145, 158, 167, 168, 170, 171, 176, 178, 179, 180, 181, 182, 186, 188, 193, 202, 207, 208, 226, 243, 244 – totally on 52 towers 189 vibration dampers have been mounted.
Broken supports in spans have been changed in ##2-3, 32-33, 39-40, 40-41, 43-44, 50-51, 78-79, 79-80, 81-82, 106-107, 107-108, 112-113, 113-114, 118-119, 122-123, 153-154, 168(in loop), 168-169, 169-170, 178(in loop), 228-229, 231-232, 237-238 totally in 21 spans and 2 loops of tower 106 supports have been changed.
On towers #42, 43, 49, 51, 52, 53, 57, 58, 62, 65, 114, 116, 121, 122, 131, 164 (16 towers) in garlands of wiring holdinging the worn reinforcement has been changed.
On towers #61, 68, 74, 130, 139, 147, 158, 159, 160, 166, 167, 177, 178, 179, 180, 186, 202, 243, 244, 245 (20 towers) in holding garlands of loops the worn reinforcement has been changed.
On towers #37, 41, 42, 51, 52, 53, 54, 55, 57, 58, 59, 62, 86, 91, 100, 101, 109, 128, 131, 137, 145, 154, 176, 189, 191, 195, 196, 241, 242 (29 towers) in fixing garlands of lightning protection the worn reinforcement (cable holding boat, fixing unit, hook etc.) has been changed.
Protection couplings have been mounted in loops #2_6, 180_3, 202-1, 207_6, 208_2, 226_6, 239_1, 243_1 _ totally on 8 towers 26 couplings have been mounted.
On the lightning protection cable of tower #86 discharging horns have been mounted, on tower #156 a damaged strand of the lightning protection cable has been repaired but on tower #168 a patch was put on the loop wiring, on towers #35 and #159 deformed protection screens have been corrected, on towers #245 triactinal twisted but #56 and #58 the turned holding pressings have been corrected;
On towers #239 and #240 triactinal twists and equalizing screens have been mounted.
The roads leading to towers #181, 148-159, 164-167, 202, 207, 208 have been cleaned; roots of trees, bushes and thorns have been chopped;
Between the wiring and earth with the aim of norms of size earth has been cut by means of bulldozer in spans #45-46, #46-47, #47-48, #56-57, #60-61, #66-67, #111-112, #115-116, #118-119, #127-128, #129-130, #147-148, #155-156 (13 spans.);
Power transmission line “Mukhrani”
An observation has been conducted on the whole length of the current line. In the sections between towers #175-207 and 219-232 warning signs have been mounted and photographing of the towers have been carried out. On tower #168 with the aim of restoration of the current line the open wirings of loops have been connected.

Other news

ლოგო-1-1200x857-2-qw31cbgkq2fy8i4erku8k3du5unuj5rgxx5ldl8rds

სს გეს „საქრუსენერგო“-ს აქციონერთა საერთო კრების შესახებ

ლოგო-1-1200x857-2-qw31cbgkq2fy8i4erku8k3du5unuj5rgxx5ldl8rds

სს გეს „საქრუსენერგო“-ს აქციონერთა საერთო კრების შესახებ

ლოგო-1-1200x857-2-qw31cbgkq2fy8i4erku8k3du5unuj5rgxx5ldl8rds

General Meeting of shareholders of JSC UES SAKRUSENERGO

This site is under construction