{"id":19597,"date":"2024-08-01T17:51:48","date_gmt":"2024-08-01T13:51:48","guid":{"rendered":"https:\/\/sakrusenergo.ge\/500%e1%83%99%e1%83%95-%e1%83%94%e1%83%92%e1%83%ae-%e1%83%9b%e1%83%a3%e1%83%ae%e1%83%a0%e1%83%90%e1%83%9c%e1%83%98\/"},"modified":"2024-10-03T11:50:53","modified_gmt":"2024-10-03T07:50:53","slug":"500%e1%83%99%e1%83%95-%e1%83%94%e1%83%92%e1%83%ae-%e1%83%9b%e1%83%a3%e1%83%ae%e1%83%a0%e1%83%90%e1%83%9c%e1%83%98","status":"publish","type":"page","link":"https:\/\/sakrusenergo.ge\/en\/500%e1%83%99%e1%83%95-%e1%83%94%e1%83%92%e1%83%ae-%e1%83%9b%e1%83%a3%e1%83%ae%e1%83%a0%e1%83%90%e1%83%9c%e1%83%98\/","title":{"rendered":"500 kV so called &#8220;Mukhran&#8221;"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"19597\" class=\"elementor elementor-19597 elementor-10924\" data-elementor-post-type=\"page\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4bf99af e-flex e-con-boxed e-con e-parent\" data-id=\"4bf99af\" data-element_type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-62755a9 e-flex e-con-boxed e-con e-parent\" data-id=\"62755a9\" data-element_type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-95117c1 elementor-widget elementor-widget-text-editor\" data-id=\"95117c1\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t        <div class=\"elementor-text-editor elementor-clearfix\"><p>The 500 kV Mukhran substation was a power transmission line connecting the energy systems of Georgia and Azerbaijan, which connected substations &#8220;Ksani-500&#8221; and &#8220;Azsres&#8221; (Azerbaijan). The length of the power transmission line on the territory of Georgia from the substation &#8220;Ksani-500&#8221; to the Georgian-Azerbaijani border was 85 km and included 280 masts. It was commissioned in 1987. The design load of the power plant was 700 MW.<\/p><p>To date, the section between the N1-N36 towers of the 500 kV &#8220;Mukhran&#8221; substation, up to the Red Bridge, has been rehabilitated and included in the &#8220;Mukhran Valley&#8221; scheme of the new 500 kV power transmission line connecting Georgia and Azerbaijan from &#8220;Gardabani-500&#8221; to &#8220;Samukh&#8221; \u201d (Azerbaijan).<\/p><p>In Marneuli, after the construction of a new substation of 500\/400 kV voltage and 800 MW capacity, in 2016, the section (56.7 km) between the N280-N110 towers of the 500 kV power line &#8220;Mukhran&#8221; was connected to the &#8220;Marneuli-500&#8221; substation.The power transmission line, which connected the substations &#8220;Ksani-500&#8221; and &#8220;Marneuli-500&#8221; with Etmaneti, was given the dispatch name 500 kV &#8220;Assureti&#8221;.<\/p><p>In 2019, the connection of the section (18 km) between the N109-N42 towers of the 500 kV substation &#8220;Mukhrani&#8221; to the &#8220;Marneuli-500&#8221; was implemented. The mentioned section will be included in the new 500 kV &#8220;Marneuli-Airum&#8221; scheme connecting Georgia and Armenia.<\/p><\/div>\n        \t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>The 500 kV Mukhran substation was a power transmission line connecting the energy systems of Georgia and Azerbaijan, which connected substations &#8220;Ksani-500&#8221; and &#8220;Azsres&#8221; (Azerbaijan). The length of the power transmission line on the territory of Georgia from the substation &#8220;Ksani-500&#8221; to the Georgian-Azerbaijani border was 85 km and included 280 masts. It was commissioned &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/sakrusenergo.ge\/en\/500%e1%83%99%e1%83%95-%e1%83%94%e1%83%92%e1%83%ae-%e1%83%9b%e1%83%a3%e1%83%ae%e1%83%a0%e1%83%90%e1%83%9c%e1%83%98\/\" class=\"more-link\">Read More <span class=\"screen-reader-text\"> &#8220;500 kV so called &#8220;Mukhran&#8221;&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"iawp_total_views":22,"footnotes":""},"class_list":["post-19597","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/pages\/19597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/comments?post=19597"}],"version-history":[{"count":7,"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/pages\/19597\/revisions"}],"predecessor-version":[{"id":22011,"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/pages\/19597\/revisions\/22011"}],"wp:attachment":[{"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/media?parent=19597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}