{"id":32862,"date":"2026-11-18T12:02:40","date_gmt":"2026-11-18T08:02:40","guid":{"rendered":"https:\/\/sakrusenergo.ge\/project\/500-%e1%83%99%e1%83%95-%e1%83%94%e1%83%92%e1%83%ae-%e1%83%99%e1%83%90%e1%83%95%e1%83%99%e1%83%90%e1%83%a1%e1%83%98%e1%83%9d%e1%83%9c%e1%83%98%e1%83%a1-%e1%83%a8%e1%83%94%e1%83%ad\/"},"modified":"2026-11-18T15:05:55","modified_gmt":"2026-11-18T11:05:55","slug":"500-%e1%83%99%e1%83%95-%e1%83%94%e1%83%92%e1%83%ae-%e1%83%99%e1%83%90%e1%83%95%e1%83%99%e1%83%90%e1%83%a1%e1%83%98%e1%83%9d%e1%83%9c%e1%83%98%e1%83%a1-%e1%83%a8%e1%83%94%e1%83%ad","status":"publish","type":"project","link":"https:\/\/sakrusenergo.ge\/en\/project\/500-%e1%83%99%e1%83%95-%e1%83%94%e1%83%92%e1%83%ae-%e1%83%99%e1%83%90%e1%83%95%e1%83%99%e1%83%90%e1%83%a1%e1%83%98%e1%83%9d%e1%83%9c%e1%83%98%e1%83%a1-%e1%83%a8%e1%83%94%e1%83%ad\/","title":{"rendered":"Connection of the 500 kV Kavkasioni transmission line to the 500\/110\/35 kV (67 MVA) Idliani Substation"},"content":{"rendered":"<p style=\"text-align: justify;\">Implementation of the project required the reconstruction of the section of the 500 kV Kavkasioni transmission line between towers No. 91 and No. 94. The reconstruction works include the dismantling and relocation of towers No. 92 and No. 94 to new locations, the dismantling of tower No. 93, and the installation of two new U2S2U-type angle towers (No. 93 and No. 93A), consisting of six tower sections, on the right bank of the Enguri River.<br \/>\nAs part of the project to connect the Kavkasioni transmission line to the Idliani Substation, it became necessary to restore the cable-stayed bridge located near the village of Idliani, providing access to the right bank of the Enguri River. The bridge had originally been constructed during the Khudoni Hydropower Plant project. Its restoration was essential to facilitate the transportation of personnel, construction materials, equipment and machinery required for the construction and installation works on towers No. 93 and No. 93A.<br \/>\nThe works commenced on 20 April 2026 as part of the project implementation. The execution of these works did not require taking the transmission line out of service. As of today, the construction works for two new U2S2U-type angle towers (No. 93 and No. 93A), consisting of six tower sections, on the right bank of the Enguri River, have been completed. Accordingly, all works scheduled for 2026 under the project to connect the 500 kV Kavkasioni transmission line to the Idliani Substation have been completed.<br \/>\nTo complete the project, it will be necessary to dismantle the existing angle towers No. 92 and No. 94 and relocate them to new positions, as well as install conductors and an optical ground wire along the reconstructed section. Since the completion of the Idliani Substation construction is scheduled for 2027, the full reconstruction of the Kavkasioni transmission line, while maintaining its operation, will be carried out in 2027.<\/p>\n","protected":false},"featured_media":32860,"template":"","class_list":["post-32862","project","type-project","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/project\/32862","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/media\/32860"}],"wp:attachment":[{"href":"https:\/\/sakrusenergo.ge\/en\/wp-json\/wp\/v2\/media?parent=32862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}