In December 2011, S.S. A brief overview of the works performed on the power transmission lines of “Sakrusenergo”.

In December 2011, S.S. A brief overview of the works performed on the power transmission lines of “Sakrusenergo”.

E.G.Kh. “Caucasus”
– Deforestation works were carried out on the territory of Russia, in particular, the trees of Egkh No. 24-25, 25-26 were deforested.
– Technical service works were also carried out: the condition of the foundations in landslide-prone zones was checked, namely on towers No. 217, 234, 388, 397, 496a and 713. Also, the section between towers No. 9-61 was inspected in the avalanche zone.

E.G.Kh. “Kartli-2”
-Zestafoni SSU carried out a tour of the section between the towers of EGK No. 1-172 in order to plan further works.
– Khashuri SSU carried out a tour of the section between the towers of the railway station No. 172-457, in order to describe additional defects and plan further works.

E.G.Kh. “Kartli-1”
– The damaged guard rail was dismantled in mall #152-158.

E.G.Kh. “threat”
-In the sections #1-12 and #12-#24a, cable installation works were carried out, rectifiers were installed and loops were connected by thermowelding to the corner masts, thus the repair works of #1-36/1 were completely completed.
– Switchover of 500 kV EGK with “Vardzia” №124-125 in Mal was completed.

E.G.Kh. “Adjara”
– The large-scale logging works of the entire length of the EKH were completed, including №7-9, 10-15, 16-17, 18-19, as well as №22-23, №37-38 and No. 48-49 Maleb.
– The access road to mast No. 2 was removed, the base of the mast and the surrounding area were also cleaned.

Other news

ლოგო-1-1200x857-2-qw31cbgkq2fy8i4erku8k3du5unuj5rgxx5ldl8rds

სს გეს „საქრუსენერგო“-ს აქციონერთა საერთო კრების შესახებ

ლოგო-1-1200x857-2-qw31cbgkq2fy8i4erku8k3du5unuj5rgxx5ldl8rds

სს გეს „საქრუსენერგო“-ს აქციონერთა საერთო კრების შესახებ

ლოგო-1-1200x857-2-qw31cbgkq2fy8i4erku8k3du5unuj5rgxx5ldl8rds

General Meeting of shareholders of JSC UES SAKRUSENERGO

This site is under construction