500 kV “Kartli-1” Transmission Line

The 500 kV “Kartli-1” transmission line interconnects the Ksani-500 and Gardabani-500 substations.

The transmission line is 91 km long and consists of 249 transmission towers. It launched operation in 1968 and is equipped with АС400/51 conductors.

The transmission line has a design transmission capacity of 900 MW.

This site is under construction